Eastern Green Link 3 and Eastern Green Link 4 (2024)


The UK Government has committed to reaching net zero emissions by 2050. This means achieving a balance between the greenhouse gases put into the atmosphere and those taken out. Decarbonising the energy system is vital to achieving net zero.

At National Grid Electricity Transmission (NGET), we are investing around £1.3bn each year to adapt and develop our network – of pylons, overhead lines, cables and substations – to connect new sources of low carbon energy to homes and businesses. We're investing for the future, connecting more and more low carbon electricity to our network and playing a crucial role in turning the UK’s net zero ambitions into reality.

National Grid Electricity Transmission (NGET) is planning to enhance the electricity network with proposals for EGL 3 and EGL 4 – two new primarily offshore high voltage electricity links and associated onshore infrastructure between Scotland and England.

The links would transport enough clean energy from Scotland to power up to four million homes in the Midlands and South of England, playing an important role in building a more secure and resilient future energy system and the decarbonisation of the UK electricity system.

In England, the proposed onshore elements of EGL 3 and EGL 4 would be in the districts of East Lindsey, Boston and South Holland, in Lincolnshire; and the district of King’s Lynn and West Norfolk, in Norfolk.

These proposals form part ofThe Great Grid Upgrade, which is the largest overhaul of the grid in generations.

Eastern Green Link 3 and Eastern Green Link 4 (1)


Read more about what we’re proposing to build and install by clicking here.

We will be seeking consent for the English onshore elements of both EGL 3 and EGL 4 via one application to the Planning Inspectorate for a Development Consent Order (DCO). Although EGL 3 and EGL 4 are independent of one another, in effect separate projects, due to their ultimate common connection point in England (the proposed new Walpole substation), we decided to develop them in parallel. In addition to enabling one DCO application, this coordinated and co-located approach to their routeing and siting provides the opportunity to potentially reduce the extent of community and environmental impact and disturbance.

Consultation is an important part of the DCO process as it enables everyone to comment on our proposals, with feedback helping to inform the development of our proposals – along with technical assessments and environmental surveys - before we submit our DCO application to the Planning Inspectorate. We have now concluded our first stage, non-statutory consultation and more information on this can be found below.

Our first stage, non-statutory, public consultation

Our first stage, non-statutory, consultation for EGL 3 and EGL 4 has now closed.

This stage of our consultation ran from 23 April 2024 to 15 July 2024 and was designed to introduce our proposals and gain early feedback. This consultation related only to the English onshore elements of EGL 3 and EGL 4.

Our main objectives were to:

  • introduce National Grid Electricity Transmission (NGET) and our proposals to you
  • explain why we are proposing new electricity transmission infrastructure in this area and the technology we would propose to use
  • outline the work carried out to identify our emerging preferred route corridor and graduated swathe
  • ensure all stakeholders have the opportunity to provide feedback on our work to date and hear your views about where our emerging preferred corridor and the exact route of our graduated swathe could be located, and how we should approach building this infrastructure
  • outline next steps to the programme, and show how we will further develop our proposals.

Ahead of submitting our application to the Secretary of State for Energy Security and Net Zero, we are set to engage in our second stage, statutory, consultation next year, where we will share our refined proposals that have taken into account the feedback received to date and the results of technical and environmental studies.

We anticipate submitting our application for development consent to the Planning Inspectorate in 2026. The Planning Inspectorate will review and examine our application, and encourage submission of views from statutory stakeholders (such as Local Authorities, Natural England and the Environment Agency), communities and other interested parties, before making a recommendation to the Secretary of State for Energy Security and Net Zero, who will decide whether to grant consent. To find out more about the DCO process, please see the Planning Inspectorate website.

View our online consultation materials

If you would like to access any of the consultation materials prepared for these projects, please visit the Document library page.

Landowners

If you are landowner or occupier who is affected by our project, or you think you may be, please visit our landowner page.

Contact us

Please get in touch if you have any questions or comments about the EGL 3 and EGL 4 projects by emailing [emailprotected] or calling 0800 298 0405.

You can also write to us (no stamp required) to: Freepost EASTERN GREEN LINKS 3 & 4.

Eastern Green Link 3 and Eastern Green Link 4 (2024)

References

Top Articles
The Complete Guide to X-Raying LinkedIn #sourcing
How to Use LinkedIn X-Ray Search — All Boolean Operators
Funny Roblox Id Codes 2023
Golden Abyss - Chapter 5 - Lunar_Angel
Www.paystubportal.com/7-11 Login
Joi Databas
DPhil Research - List of thesis titles
Shs Games 1V1 Lol
Evil Dead Rise Showtimes Near Massena Movieplex
Steamy Afternoon With Handsome Fernando
Which aspects are important in sales |#1 Prospection
Detroit Lions 50 50
18443168434
Newgate Honda
Zürich Stadion Letzigrund detailed interactive seating plan with seat & row numbers | Sitzplan Saalplan with Sitzplatz & Reihen Nummerierung
Grace Caroline Deepfake
978-0137606801
Nwi Arrests Lake County
Justified Official Series Trailer
London Ups Store
Committees Of Correspondence | Encyclopedia.com
Pizza Hut In Dinuba
Jinx Chapter 24: Release Date, Spoilers & Where To Read - OtakuKart
How Much You Should Be Tipping For Beauty Services - American Beauty Institute
Free Online Games on CrazyGames | Play Now!
Sizewise Stat Login
VERHUURD: Barentszstraat 12 in 'S-Gravenhage 2518 XG: Woonhuis.
Jet Ski Rental Conneaut Lake Pa
Unforeseen Drama: The Tower of Terror’s Mysterious Closure at Walt Disney World
Ups Print Store Near Me
C&T Wok Menu - Morrisville, NC Restaurant
How Taraswrld Leaks Exposed the Dark Side of TikTok Fame
University Of Michigan Paging System
Dashboard Unt
Access a Shared Resource | Computing for Arts + Sciences
Speechwire Login
Healthy Kaiserpermanente Org Sign On
Restored Republic
3473372961
Jambus - Definition, Beispiele, Merkmale, Wirkung
Ark Unlock All Skins Command
Craigslist Red Wing Mn
D3 Boards
Jail View Sumter
Nancy Pazelt Obituary
Birmingham City Schools Clever Login
Thotsbook Com
Funkin' on the Heights
Vci Classified Paducah
Www Pig11 Net
Ty Glass Sentenced
Latest Posts
Article information

Author: Kerri Lueilwitz

Last Updated:

Views: 5850

Rating: 4.7 / 5 (47 voted)

Reviews: 94% of readers found this page helpful

Author information

Name: Kerri Lueilwitz

Birthday: 1992-10-31

Address: Suite 878 3699 Chantelle Roads, Colebury, NC 68599

Phone: +6111989609516

Job: Chief Farming Manager

Hobby: Mycology, Stone skipping, Dowsing, Whittling, Taxidermy, Sand art, Roller skating

Introduction: My name is Kerri Lueilwitz, I am a courageous, gentle, quaint, thankful, outstanding, brave, vast person who loves writing and wants to share my knowledge and understanding with you.